News

How winding equipment for acceptance testing

Posted By 2015 January 28th Wednesday

After the purchase of Winder, we need new equipment for acceptance testing, it should be how to make the acceptance of it winding equipment, there is no very clear standards as a reference, many users are often judged based on their experience, so present on the device the details of the problem often can not be found, in general, should be detected according to the following steps:
First, visual and measuring, in the device out of the box assembling process can be observed in the appearance of the device, and various configurations are complete, to check the situation and the smoothness of the contact member is sliding in the assembly process, using a variety of detection tool axis and sets of holes for measuring concentricity to view the relevant parts of the lubrication action should be stable, reliable, non-blocking phenomenon.
The second step is to run the test case of idle running, no load for 30 minutes or so, check the bearing parts, sliding parts should be no significant temperature rise, test equipment during the idling operation of the high and low speed of the implementation of various actions is good when detected across the parking slot position accuracy, while the brakes are effective to detect whether the device over the line and over the line tension wheel smooth smooth.
Regulations.
winding machine been idle with a line needs to run after run, with a line process should detect the number of coil count is accurate, cable device is smooth and accurate movement control setting process visual wound coil is good smooth and compact, wire insulation is good.